Equipped with a 2-cycle, 21.2 cc engine, it delivers plenty of drilling power with a lightweight design helping to reduce operator fatigue
Track Maintenance Tools
Racine Railroad offers the right equipment for
every rail track maintenance challenge.
Our tools are durable, mobile, and built to help
your crew work efficiently — wherever the job takes them.
Allows greater flexibility in tight work areas with a single pull handle that integrates the engine throttle to control spindle speed, while enabling tool-free cutter and rail shoe changes
Used in tie drilling applications and crossing projects for pre-drilling holes for lag screws and bridge timber screws
Drills starter/spike holes in wood railroad ties, features a built-in depth stop for safe and accurate hole drilling
Features a compact design allowing the operator greater flexibility in tighter work areas with no tools necessary to change cutters or rail shoes

