Lifts the rails and inserts the tie plates in the proper position on the ties, then lowers the rails onto the plates, enabling a secure rail-to-tie connection
Track Maintenance Equipment
We are committed to engineering and manufacturing reliable
maintenance-of-way equipment with an emphasis on safety
and performance offering customizable solutions for both
Class I railroads and transit operations.
Squeezes all types of rail anchors during wood tie replacement, surfacing, or rail replacement quality control operations
Squeezes or spreads anchors on both rails simultaneously or independently
Repositions anchors without removal in tie-out configuration, on both rails simultaneously or independently
A dual-workhead machine that installs and removes e‑clips on one rail or two rails simultaneously
A single operator machine that applies and retracts 2 or 4 Pandrol® Fast Clips on 1 rail
The only Dual Workhead Production / Maintenance machine that applies and retracts Safelok I and Safelok III clips
Single operator machine with magnetic conveyors that collects ferrous material from the track surface into an onboard hopper at speeds of up to 80 feet per minute
Realigns skewed concrete ties with precision using hydraulic control and laser-guided alignment, ensuring efficient correction in full crib conditions with minimal ballast disturbance
A dual workhead production/maintenance machine that applies and retracts Pandrol®, Safelok I®, Safelok III®, Shur-Lok®, and Air Boss® type clips
The TOWD Reclaimer is an unmanned magnetic unit designed to recover ferrous material from the track
Installs and removes two rail clips simultaneously on a single rail, using workhead arms that apply steady hydraulic pressure rather than hammer impacts to ensure the clip retains full holding power